WHAT ARE YOU LOOKING FOR?

Erzurum Transportation Master Plan Traffic Emergency Action Studies and Projects

Within the scope of Erzurum Urban Transportation Master Plan study, the traffic volume carried by the existing structure at 20 intersections within the study area was determined, and the project and intersection simulation studies needed for the intersections were completed by reporting in accordance with the traffic survey principles.

Signaling and interchange arrangement suggestions have been developed for the interchange and recommendation rail system line in transportation and traffic improvement studies.

  • Province ERZURUM
  • Country Türkiye
  • Client

    Erzurum Metropolitan Municipality

    Department of Transportation

  • Work Schedule 2012-2013
  • Scope of the Work
    • Collection of Available Information
    • Interchange and Route Counts
    • Identifying Current and Future Problems
    • Transportation and Traffic Improvement Studies and Projects
    • Traffic Studies and Simulations
    • 3D Perspectives