Within the scope of the Preparation of Short-Term Highway Junction Projects in Eyüpsultan District, a total of 8 working areas were determined by the administration in the city for more effective and efficient use of existing capacities, and transportation and traffic planning, traffic management and traffic engineering solutions were prepared for them.
In the study, 25 intersection points were examined and geometric deficiencies, capacity and signaling problems were determined and solutions were developed for these interchanges.
- Province İSTANBUL
- Country Türkiye
-
Client
Eyüpsultan Municipality Plan and Project Directorate
- Work Schedule 2019-2020
-
Scope of the Work
- Interchage Traffic Counts
- Preparation of Level Intersection Geometric Arrangement Preliminary Projects and Testing with Simulation
- Preparation of City Center Traffic Routing Direction Plan