Project works have been carried out for Konya Metropolitan Municipality for the extension of the existing tram line in the direction of Mevlana Street, Fetih Street Junction - Ereğli Beltway Junction. It is aimed to extend the existing line arriving at Alaattin Hill to continue on Mevlana Street, to reduce the road traffic in the area with historical buildings and to provide transportation to the developing residential areas.
The length of the tram line between Alaattin Hill and Ereğli Junction is approximately 5 km. The route with 8 stations is connected to the storage area and maintenance-repair facility for the rail system vehicles at the end. As a result of the Feasibility Report, it is planned to provide required capacity even in the case that the number of vehicles increases in the future.
- Province KONYA
- Country Türkiye
-
Client
Konya Metropolitan Municipality
Department of Development and Urbanization
- Work Schedule 2008-2009
-
Scope of the Work
- Preliminary Project
- Feasibility Study
- Implementation Project
- Capacity Calculations
- Route Design
- Line Superstructure and Design
- Line Type Sections and Clearances
- Station Layout Plans
- Storage Area and Workshop Design
- Mechanical Installation
- Electrical Installation
- Electro-Mechanical Systems
- Electrification
- Signalization
- Vehicle Specifications for the Line
- Geology
- Soil Surveys
- Infrastructures
- Drainage
- Investment Costs